Below are posted the links to the 245 files that represent the Environmental Statement documents for the proposed Kilgallioch wind farm. As with similar posts in the past, this is a one-off document structure. I have therefore attempted to lay it out in a 'logical' manner. The only file of significant size within this matrix is the Scoping Response (Appendix 6-1) at 18MB. This is because this is a scanned pdf file, not a 'native' pdf file.

Just as before, the coffee table summary is the Non Technical Summary and the real detail is contained in the remaining files. The individual chapters and appendices are quite small, so I suggest you download those that are appropriate to your interests and then reference the relevant figures from the drop down selector boxes as required.

The photomontages (figures 7-38 to 7-59) are often split across multiple pages and as a result, are sometimes difficult to interpret. I will be posting zoomable, merged, single image versions of these in about a weeks time. To get the 'full effect' of the photomontages, you should set your pdf viewer to 'Actual Size'. I cannot include instructions on how to do this, as their are so many different PDF viewers, I would be here until doomsday explaining all the possibilities (even if I knew what they were).


Volume 1 - Chapters
Contents
Preface
Non-Technical Summary
1Introduction
2Environmental Impact Assessment
3Site Selection & design
4Project Description
5Planning Policy Context
6Scoping & Consultation
7Landscape & Visual
8Archaeology & Cultural Heritage
9Ecology
10Ornithology
11Geology, Soils & Hydrogeology
12Surface Hydrology
13Noise
14Acces, Transport & Traffic
15Socio-economic, Tourism & Recreation Land Use
16Other IssuesFigure 16 - 1 Shadow Flicker Assessment

Volume 2 - Appendicies
Contents
4.1Borrow Pit Assessment Report
4.2Forestry
4-3Water Management Plan
6-1Scottish Government Scoping Opinion
7-1Landscape and Visual Assessment
8-1Archaeological Desk Based Assessment
8-2Scheduled Monuments within 5 km
9-1Ecology Field Survey Results
9-2Bat Surveys
9-3Electrofishing Survey Reports
9-4Electrofishing Survey Locations
10-1Ornithology Technical Report
10-2Examples of Collision Risk Modelling Inputs and Summary Outputs
11-1Peat Slide Risk Assessment
12-1Private Water Supplies Risk Assessment
12-2Site Photographs
13-1Manufacturers' Noise Data
13-2Baseline Noise Survey Records
13-3Detailed Predicted Noise Levels
13-4Construction Noise Assessment
14-1Traffic Generation


Finally, if you are receiving this post via email you'll probably find the drop down lists don't work for you. This is as a result of the code used to 'power' them. If you wish to access the documents listed in the drop down lists and are having trouble with them from within your email client, please visit the blog where you shouldn't encounter any such problems. If anyone encounters ANY OTHER problems with the download links, please let me know via the 'Get in Touch' link at the top of the blog.